Research-based planning guide

Commercial flooring submittals: what to approve before materials arrive

Before commercial flooring materials are ordered, assemble the product details, samples and installation information the project team needs to approve. A color swatch alone doesn't establish that the full system is suitable. Keep the approved version connected to purchasing and installation.

On this page

Identify the complete system

Record flooring manufacturer, product, color, backing, adhesive and accessories. Include transitions, base and any special preparation products. Confirm whether the intended use and maintenance needs match the specification.

Shaw Contract's installation library shows why product-specific instructions belong in the review. Requirements can differ by flooring and installation method; don't apply one system's allowances to another.

Use a submittal register

ItemReview question
Product dataIs this the specified product and construction?
Physical sampleHas the color, texture and relevant variation been reviewed?
Installation informationWhat site conditions and preparation are required?
AccessoriesAre transitions and edge details coordinated?
Care and warrantyWhat obligations and limits apply?
Approval statusApproved, revised or still awaiting a decision?

Ask the project team who has authority to approve each item. An emailed sample photo isn't necessarily formal approval to purchase.

Keep design approval separate from site readiness

A product can be approved while the substrate remains unready. Confirm who checks moisture, condition and other manufacturer requirements before installation. If the site fails a requirement, use the agreed change process rather than silently substituting a different adhesive.

Similarly, a signed sample doesn't resolve equipment loading, cleaning chemicals or accessibility details that weren't part of the review. Send those questions to the appropriate project professional.

Control revisions through delivery

Label each submission and revision. If a color or product becomes unavailable, require review of the substitute before ordering. Keep the accepted change with the purchase record.

On delivery, ask how labels and quantities are checked against the approval. Agree on storage conditions and who handles damaged or incorrect material. Don't wait until installation day to discover the order follows an obsolete version.

Use the tenant-improvement checklist and schedule guide. To discuss planning questions, provide the project stage and unresolved approvals. This guide organizes decisions; it doesn't certify a product or replace the responsible designer and installer.